The Busvine Line. Began May 2016

In 2016 the shed housing the train set-up required some heavy repair work, so the whole railway caboodle had to be dismantled and packed away before the required work could be carried out. 
When replaced several changes were made to the track design and some of the buildings were scrapped or replaced.  These are some photographs of the new layout.
Note: The photos shown below are fairly representative of the present set-up (April 2018) although the layout is constantly being updated.